- Eureka Hunter Pipeline consists of:
- 182 miles of rights of way initially allowed for the transportation of a mix of crude oil and natural gas, and these rights of way allow for replacement and repair of the existing pipeline with no restriction to size of the pipeline
- Separated in two areas: Northern West Virginia (approximately 114 miles) and Central West Virginia (approximately 68 miles
- Northern West Virginia section is situated in the heart of the Marcellus Shale development
- Located through many counties: Pleasants, Tyler, Ritchie, Wetzel, Marion, Harrison, Doddridge, Lewis and Monongali
- Reconfiguring existing low pressure gathering system to move up to 200 million cubic feet of gas per day in high pressure environment
- Initial capital plan of approximately $10 million in 2010
|
|
|
|
|